Essential details
Quantity(pieces):10000
Volume:0.028 m³
MOQ:500000
G.W:9.8 kg
Lead time:15 days after the deposit is received
Size:L(42)*W(29)*H(23) cm
N.W:9.2 kg
Shipping:Land freight, Ocean freight
Package Description:纸箱
Product Introduction
The EAS process begins by attaching tags to merchandise. When an item is purchased, the tag is removed or deactivated. If merchandise with an active label or hard tag is carried past the detection system, the system alarm sounds.
Product details
