Essential details
Quantity(pieces):500
Volume:0.028 m³
MOQ:100000
Lead time:15 days after receiving the deposit
Size:L(42)*W(29)*H(23) cm
Shipping:Ocean freight, Land freight
Package Description:Paper box
Product Introduction
The EAS process begins by attaching tags to merchandise. When an item is purchased, the tag is removed or deactivated. If merchandise with an active label or hard tag is carried past the detection system, the system alarm sounds.
Product details


